# How Long Does a House Extension Take in the UK, Start to Finish?

> Design and approvals take 3 to 9 months; the build is usually 3 to 6 months for a single-storey extension. See the full timeline.

Last updated: 2026-11-14

Design and approvals take 3 to 9 months; the build is usually 3 to 6 months for a single-storey extension. See the full timeline.

Remodelers UK

Updated November 2026

5 min read

**In this guide**

Plan this room in 3D →

**Short answer:** A single-storey house extension typically takes 6 to 15 months from first design to handover: 3 to 9 months for design, engineering, approvals and finding a builder, then 3 to 6 months on site. Double-storey projects add months, and delivery delays and weather can stretch both phases.

## The typical timeline

| Stage | Typical duration |
|---|---|
| Brief, survey and design | 1 to 3 months |
| Planning or lawful development certificate | 2 to 3 months (8 weeks target for most householder applications) |
| Building Regulations drawings and engineer | 1 to 2 months (can overlap) |
| Tendering and choosing a builder | 1 to 2 months |
| Build | 3 to 6 months |
| Snagging and completion certificate | 2 to 4 weeks |

## What delays projects

- Planning objections or requests for changes.
- Party wall notices and awards.
- Long lead times for steel, glazing and kitchens.
- Winter weather during groundworks and roofing.

## How to save time

- Decide the layout and kitchen early.
- Order long-lead items as soon as drawings are approved.
- Choose the builder before the start date, not after.

## Plan before you pay

A 3D plan lets you settle the layout, glazing and furniture before the drawings are finalised, which avoids redesign during the build.

## Frequently asked questions

### How long does planning permission take?

Householder applications are normally determined within 8 weeks, although some take longer.

### Can I live in the house during the build?

Often yes for a rear extension, with kitchen disruption.

[Plan this room in 3D and keep your measurements for quotes](https://remodelers.uk/studio/?from=%2Fblog%2Fhow-long-does-an-extension-take-uk%2F)

## Related guides

- [Rear extension cost](https://remodelers.uk/blog/rear-extension-cost-per-square-metre-uk/)
- [Rear extension planning checklist](https://remodelers.uk/rear-extension-planning-checklist-uk/)
- [Party Wall Act](https://remodelers.uk/blog/party-wall-act-explained-home-renovation/)

This guide is general information for homes in the UK, not legal, structural or financial advice. Costs are indicative ranges and vary with your property, region, specification and builder; always obtain written quotes.

---
Source: https://remodelers.uk/blog/how-long-does-an-extension-take-uk/