# How to Compare Builder Quotes Line by Line (UK)

> Three quotes, three different totals. Here is how to compare UK builder quotes line by line: scope, allowances, VAT, programme and exclusions.

Last updated: 2026-11-14

Three quotes, three different totals. Here is how to compare UK builder quotes line by line: scope, allowances, VAT, programme and exclusions.

Remodelers UK

Updated November 2026

5 min read

**In this guide**

Plan this room in 3D →

**Short answer:** To compare builder quotes fairly, give every builder the same measured plan and specification, then compare the quotes line by line for scope, provisional sums, VAT, exclusions, programme and payment schedule. A cheaper total often leaves out something the dearer one includes.

## Give every builder the same brief

Quotes only compare when the scope is identical. Provide a measured plan, photos, a finishes schedule and a list of what you are supplying. A room built in 3D from your own photos, and shared as a link, gives each builder the same picture without a site visit for the first pass.

## What to check line by line

| Item | What to look for |
|---|---|
| Scope | Same rooms, same finishes, same structural work |
| Provisional sums | How much is allowed for tiles, sanitaryware, kitchen and electrics |
| Exclusions | Skips, scaffolding, making good, decoration, fees |
| VAT | Included or not, and the rate |
| Programme | Start date, duration and what slips if the weather or deliveries do |
| Payment | Stage payments tied to work done, not dates |

## Red flags

- A large deposit before any work or materials are on site.
- No written scope, only a total.
- Prices far below the others with no explanation.
- No insurance details or unwillingness to share references.

## After you choose

Sign a written contract, keep a variations log and hold back a retention until snagging is complete. Our guide on [checking a builder before paying a deposit](https://remodelers.uk/blog/how-to-check-a-builder-before-you-pay-a-deposit/) covers insurance and references.

## Frequently asked questions

### How many quotes should I get?

Three is the common minimum for a major project, but two or three with the same scope is better than five with different ones.

### Should I pick the cheapest?

Not automatically. Compare what is included and how well the builder communicates before you decide.

[Make a shareable 3D room to send with your brief](https://remodelers.uk/studio/?from=%2Fblog%2Fhow-to-compare-builder-quotes-uk%2F)

## Related guides

- [Tradespeople day rates](https://remodelers.uk/blog/tradespeople-day-rates-uk/)
- [VAT on renovation work](https://remodelers.uk/blog/vat-on-renovation-work-uk/)
- [Contingency budget](https://remodelers.uk/blog/renovation-contingency-budget-buffer-uk/)

This guide is general information for homes in the UK, not legal, structural or financial advice. Costs are indicative ranges and vary with your property, region, specification and builder; always obtain written quotes.

---
Source: https://remodelers.uk/blog/how-to-compare-builder-quotes-uk/