Short answer: In 2026 a rooflight (Velux) loft conversion typically costs £30,000 to £45,000, a rear dormer £40,000 to £65,000, a hip-to-gable £50,000 to £70,000 and a mansard £60,000 to £90,000 or more, before VAT and fees. The right type depends on your roof shape and headroom more than your budget.
Costs by loft conversion type
| Type | Typical cost | Best for |
|---|---|---|
| Rooflight | £30,000–£45,000 | Roofs with 2.2 m or more head height; least disruption |
| Rear dormer | £40,000–£65,000 | Terraces and semis needing a full-height room |
| Hip-to-gable | £50,000–£70,000 | Semi-detached and detached houses with hipped roofs |
| Mansard | £60,000–£90,000+ | Terraces where planning allows; often in London |
Basis: typical UK 2026 builder and supplier prices for labour and materials, excluding VAT, design fees and application fees. London and the South East often run 15 to 30 per cent higher; much of the north, Scotland, Wales and Northern Ireland is often lower. The wider UK loft range of £30,000 to £70,000 covers most single-room conversions.
What the price includes
Structure and steel, floor strengthening, insulation, windows, stairs, electrics, heating, plastering and basic decoration. A bathroom or en suite adds roughly £6,000 to £12,000 and changes to the staircase below are an extra.
Headroom and structure decide the type
The Building Regulations require a safe staircase and a reasonable ceiling height; as a rule of thumb, a clear internal height of about 2.2 m over a useful floor area is what makes a loft worth converting. A structural engineer will check the floor joists and any trusses before design starts.
Planning and approvals
Many rear dormers and rooflight conversions can be done under permitted development with volume limits (40 m³ for terraced houses, 50 m³ for other houses in England), but not in conservation areas or on flats. Building Regulations approval is always required. See the permitted development limits in our limits guide.
Frequently asked questions
How long does a loft conversion take?
Typically 8 to 14 weeks on site for a dormer, after design and approvals.
Do I need planning permission?
Often not for rear dormers and rooflight conversions, but you do need Building Regulations approval and, in some cases, a party wall notice.
How much value does a loft conversion add?
It depends on the area and house type, so ask local estate agents for comparable sold prices.
Related guides