Short answer: To compare builder quotes fairly, give every builder the same measured plan and specification, then compare the quotes line by line for scope, provisional sums, VAT, exclusions, programme and payment schedule. A cheaper total often leaves out something the dearer one includes.
Give every builder the same brief
Quotes only compare when the scope is identical. Provide a measured plan, photos, a finishes schedule and a list of what you are supplying. A room built in 3D from your own photos, and shared as a link, gives each builder the same picture without a site visit for the first pass.
What to check line by line
| Item | What to look for |
|---|---|
| Scope | Same rooms, same finishes, same structural work |
| Provisional sums | How much is allowed for tiles, sanitaryware, kitchen and electrics |
| Exclusions | Skips, scaffolding, making good, decoration, fees |
| VAT | Included or not, and the rate |
| Programme | Start date, duration and what slips if the weather or deliveries do |
| Payment | Stage payments tied to work done, not dates |
Red flags
- A large deposit before any work or materials are on site.
- No written scope, only a total.
- Prices far below the others with no explanation.
- No insurance details or unwillingness to share references.
After you choose
Sign a written contract, keep a variations log and hold back a retention until snagging is complete. Our guide on checking a builder before paying a deposit covers insurance and references.
Frequently asked questions
How many quotes should I get?
Three is the common minimum for a major project, but two or three with the same scope is better than five with different ones.
Should I pick the cheapest?
Not automatically. Compare what is included and how well the builder communicates before you decide.