Short answer: Converting a single integral garage into a habitable room typically costs £15,000 to £35,000 in 2026 before VAT and fees. Insulating the floor and walls and replacing the door with a window and wall are the biggest items, and Building Regulations approval is always required.
Line-by-line costs for a single garage
| Item | Typical £ |
|---|---|
| Remove garage door, build infill wall and window | £3,000–£7,000 |
| Insulated floor (damp-proof membrane, insulation, screed) | £2,500–£5,500 |
| Wall and ceiling insulation and plastering | £2,500–£5,000 |
| Electrics, lighting and heating | £2,000–£4,500 |
| Flooring, decoration and finishes | £1,500–£4,000 |
| Building Control and drawings | £1,000–£2,500 |
Basis: typical UK 2026 builder and supplier prices for labour and materials, excluding VAT, design fees and application fees. London and the South East often run 15 to 30 per cent higher; much of the north, Scotland, Wales and Northern Ireland is often lower.
What makes it more expensive
- Lowering the floor to gain headroom.
- Adding a shower room or utility plumbing.
- Detached garages with no services.
- Garage walls that are single-skin and need to be rebuilt.
Planning and regulations
Many internal garage conversions do not need planning permission, but check for a condition on your original planning permission that required the garage to remain as parking. Building Regulations apply for insulation, ventilation, fire safety and electrics.
Plan the layout before you commit
The ceiling height and the position of the old door and services decide where furniture can sit. Scan or measure the garage, drop it into a 3D room and try layouts for an office, playroom or bedroom before the builder starts.
Frequently asked questions
Do I need planning permission to convert my garage?
Usually not for internal works, but a planning condition may apply. A lawful development certificate or a quick pre-application check will tell you.
Does converting a garage devalue a house?
Where parking is scarce it can; ask a local agent, because buyers differ by street.
How long does it take?
Commonly 4 to 8 weeks on site.